X-326 Building

X-326 BuildingThe X-326 enriched uranium for use in the U.S. nuclear defense program. Construction of the X-326 began in 1952. The final unit was completed and turned over on February 3, 1956. Cascade flow from the X-330 enters the building at the northeast corner and is directed into the first cell in unit X-27-l. The X-326 was the last of the three process buildings to be entirely completed and released to the Atomic Energy Commission.

In addition to enrichment and purge operations, the X-326 was the primary facility onsite for product withdrawal. (The original plant design was based on a need for highly enriched UF6, and the primary withdrawal high assay withdrawal facility was located in the southwest corner of the X-326, on the ground floor). Gradually, however, the site’s mission and purpose moved from weapons grade material to nuclear reactor material which was in the 2 to 4.95% enrichment range. Two facilities were provided to withdrawal those materials: the Extended Range Production (ERP) station, which was located in the northeast corner of Building X-326, and the low-assay withdrawal station (LAW) located in the west central section of the X-333.

CONSTRUCTION
Completed in 1956

SQUARE FEET
approx. 2.5M sq. ft. of floor space on two floors



Home FACILITY HOME      Information FACILITY INFORMATION      Videos VIDEOS      Pictures PICTURES     Interviews INTERVIEWS

Return to Plant Map
 
HOME|HISTORY|PHOTOS|VIDEOS|LOCAL IMPACT|NEWS ARCHIVE|SOURCES|CONTACT US

PortsVirtualMuseum.org is operated and managed by Fluor-B&W Portsmouth for DOE

Site designed and maintained by Westside Media