X-530 Switchyard Facilities
Structures in the X-530 Electrical Switchyard Complex
Facility |
Identification |
Date Built |
Area (sq ft) |
Construction |
X-530A | Switchyard | 1954 | 780,000 | Limestone gravel bed |
X-530B | Switch Houses and Control House | 1954 | 112,600 | Steel frame, transite |
X-530C | Test and Repair Facility | 1954 | 1,200 | Steel frame, transite |
X-530D | Oil House | 1954 | 500 | Steel frame, transite |
X-530E | Valve House | 1954 | 500 | Reinforced concrete |
X-530F | Valve House | 1954 | 500 | Reinforced concrete |
X-530G | GCEP Oil Pumping Station | 1980 | 500 | Metal sides, roof |